S series CZPTcal Geared Motor Traits
one. Functions:
- High effectiveness: seventy five%-80%
- Large technological innovation: the helical gear and a worm equipment combined with an integrated transmission to increase the torque and effectiveness.
- High precision: the gear is manufactured of high-quality alloy metal forging, carbonitriding and hardening therapy, grinding method to ensure high precision and stable running.
- Higher interchangeability: hugely modular, serial style, powerful flexibility and interchangeability.
2. CZPT parameters
Ratio | six.8-288 |
Input power | .twelve-22KW |
Output torque | eleven-4530N.m |
Output speed | 5-206rpm |
Mounting kind | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Technique | Flange input(AM), shaft enter(Advert), inline AC motor input, or AQA servo motor |
Brake Release | HF-manual launch(lock in the brake release place), HR-handbook release(autom-atic braking position) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Place | M1, M2, M3, M4, M5, M6 |
Kind | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing materials | HT200 high-toughness cast iron from R37,forty seven,57,sixty seven,77,87 |
Housing material | HT250 High power solid iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment |
Solitary Stage Efficiency | 75%-80% |
Lubricant | VG220 |
Defense Class | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould business, was set up in 1965. CZPTshine specializes in the total electrical power transmission solution for higher-conclude tools producing industries based on the goal of “Platform Merchandise, Software Design and Professional Provider”.
CZPTshine have a strong specialized power with more than 350 employees at existing, including over 30 engineering professionals, thirty top quality inspectors, masking an location of 80000 sq. meters and varieties of CZPTd processing machines and testing equipments. We have a good basis for the business application development and provider of higher-finish velocity reducers & variators possessing to the provincial engineering technologies analysis centre,the lab of equipment velocity reducers, and the base of contemporary R&D.
Our Crew
High quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
7. Certification.
Packing
Delivery