Helical Gear Reduction Motor with Solid Shaft

Helical Gear Reduction Motor with Solid Shaft

R series CZPTcal Geared Motor Qualities

1. Characteristics:

one. High effectiveness: 92%-ninety seven%

 

two. Compact composition: Tiny offset output, two stage and three stage are in the identical box.

 

three. High precision: the equipment is manufactured of high-good quality alloy steel forging, carbonitriding and hardening remedy, grinding approach to ensure high precision and steady running.

four. High interchangeability: highly modular, serial style, sturdy versatility and interchangeability.

2. CZPT parameters

Ratio three.41-289.seventy four
Input energy .12-160KW
Output torque sixty one-23200N.m
Output speed five-415rpm
Mounting kind Foot mounted, flange mounted, foot and flange mounted, single-stage foot mounted, solitary stage flange mounted, Flange-mounted with extended bearing hub
Enter Approach Flange enter(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor
Brake Launch HF-manual release(lock in the brake release place), HR-manual release(autom-atic braking situation)
Thermistor TF(Thermistor protection PTC thermisto)
TH(Thermistor security Bimetal swotch)
Mounting Placement M1, M2, M3, M4, M5, M6
Sort R17-R167
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing material HT200 large-power forged iron from R37,47,57,67,seventy seven,87
Housing materials HT250 Substantial energy forged iron from R97 107,137,147,157,167,187
Warmth treatment technology carbonitriding and hardening therapy
Effectiveness ninety two%-97%
Lubricant VG220
Protection Class IP55, F class

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould organization, was proven in 1965. CZPTshine specializes in the comprehensive energy transmission resolution for high-finish equipment producing industries based mostly on the intention of “Platform Item, Application Style and Professional Support”.
CZPTshine have a powerful complex power with over 350 personnel at existing, including in excess of thirty engineering experts, 30 top quality inspectors, masking an region of 80000 sq. meters and varieties of CZPTd processing equipment and tests equipments. We have a excellent foundation for the industry software advancement and support of higher-end speed reducers & variators owning to the provincial engineering technology study heart,the lab of gear pace reducers, and the foundation of modern day R&D.

Our Crew

Good quality Management
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

Helical Gear Reduction Motor with Solid Shaft