S Series Foot Mounted Helical Worm Gear Reducer with Motor

S Series Foot Mounted Helical Worm Gear Reducer with Motor

S series CZPTcal Geared Motor Traits

one. Features:

  1. High performance: 75%-eighty%
  2. Higher technology: the helical gear and a worm gear blended with an integrated transmission to boost the torque and effectiveness.
  3. Large precision: the equipment is manufactured of substantial-top quality alloy steel forging, carbonitriding and hardening treatment method, grinding approach to guarantee large precision and steady running.
  4. Higher interchangeability: very modular, serial style, powerful flexibility and interchangeability.

two. CZPT parameters
 

Ratio six.8-288
Input energy .twelve-22KW
Output torque 11-4530N.m
Output velocity five-206rpm
Mounting variety Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Enter Method Flange input(AM), shaft enter(Advertisement), inline AC motor input, or AQA servo motor
Brake Launch HF-handbook launch(lock in the brake launch situation), HR-handbook release(autom-atic braking situation)
Thermistor TF(Thermistor safety PTC thermisto)
TH(Thermistor security Bimetal swotch)
Mounting Placement M1, M2, M3, M4, M5, M6
Type S37-S97
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm,
Housing content HT200 high-strength forged iron from R37,47,57,sixty seven,77,87
Housing materials HT250 Higher toughness forged iron from R97 107,137,147,
157,167,187
Warmth treatment technology carbonitriding and hardening treatment
Single Phase Effectiveness seventy five%-80%
Lubricant VG220
Defense Class IP55, F class

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould company, was recognized in 1965. CZPTshine specializes in the comprehensive electrical power transmission resolution for higher-stop gear production industries dependent on the goal of “Platform Product, Software Style and Skilled Services”.
CZPTshine have a robust specialized power with over 350 staff at existing, such as over 30 engineering technicians, 30 good quality inspectors, covering an region of 80000 square meters and varieties of CZPTd processing equipment and screening equipments. We have a excellent basis for the market software improvement and support of higher-end pace reducers & variators possessing to the provincial engineering technological innovation study center,the lab of gear pace reducers, and the foundation of modern R&D.

Our Group

Quality Handle
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

 

S Series Foot Mounted Helical Worm Gear Reducer with Motor