S Series Helical Worm AC Gear Motor

S Series Helical Worm AC Gear Motor

S sequence CZPTcal Geared Motor Characteristics

one. Features:

  1. High performance: seventy five%-eighty%
  2. High technologies: the helical gear and a worm equipment mixed with an integrated transmission to enhance the torque and effectiveness.
  3. Substantial precision: the equipment is produced of large-top quality alloy metal forging, carbonitriding and hardening remedy, grinding procedure to make sure large precision and steady working.
  4. High interchangeability: very modular, serial design and style, powerful flexibility and interchangeability.

2. CZPT parameters
 

Ratio 6.8-288
Enter power .12-22KW
Output torque eleven-4530N.m
Output velocity five-206rpm
Mounting kind Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Input Method Flange enter(AM), shaft enter(Advertisement), inline AC motor enter, or AQA servo motor
Brake Release HF-handbook release(lock in the brake release place), HR-guide launch(autom-atic braking placement)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor defense Bimetal swotch)
Mounting Position M1, M2, M3, M4, M5, M6
Kind S37-S97
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm,
Housing materials HT200 high-toughness forged iron from R37,forty seven,fifty seven,67,77,87
Housing substance HT250 High power forged iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening therapy
Single Phase Efficiency seventy five%-80%
Lubricant VG220
Security Course IP55, F class

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould enterprise, was set up in 1965. CZPTshine specializes in the complete electrical power transmission resolution for large-stop equipment producing industries dependent on the goal of “System Solution, Software Design and style and Specialist Service”.
CZPTshine have a robust specialized drive with over 350 staff at current, such as over thirty engineering experts, thirty high quality inspectors, covering an region of 80000 square meters and types of CZPTd processing devices and tests equipments. We have a good foundation for the sector application development and support of high-stop speed reducers & variators possessing to the provincial engineering technology investigation heart,the lab of gear speed reducers, and the foundation of contemporary R&D.

Our Staff

High quality Manage
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

seven. Certification.

Packing

Delivery

 

S Series Helical Worm AC Gear Motor