S Series Helical Worm Gear Set

S Series Helical Worm Gear Set

S series CZPTcal Geared Motor Traits

one. Functions:

  1. Large performance: seventy five%-80%
  2. Large technology: the helical gear and a worm gear combined with an integrated transmission to enhance the torque and efficiency.
  3. Higher precision: the gear is produced of large-quality alloy metal forging, carbonitriding and hardening treatment method, grinding method to ensure higher precision and secure operating.
  4. Substantial interchangeability: highly modular, serial layout, sturdy versatility and interchangeability.

two. CZPT parameters
 

Ratio six.eight-288
Enter power .12-22KW
Output torque eleven-4530N.m
Output velocity 5-206rpm
Mounting sort Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Enter Strategy Flange input(AM), shaft enter(Ad), inline AC motor input, or AQA servo motor
Brake Release HF-handbook release(lock in the brake launch place), HR-manual release(autom-atic braking placement)
Thermistor TF(Thermistor security PTC thermisto)
TH(Thermistor defense Bimetal swotch)
Mounting Position M1, M2, M3, M4, M5, M6
Kind S37-S97
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm,
Housing materials HT200 high-power cast iron from R37,47,57,67,77,87
Housing materials HT250 Large toughness forged iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening treatment method
Solitary Phase Effectiveness 75%-80%
Lubricant VG220
Defense Class IP55, F class

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould company, was set up in 1965. CZPTshine specializes in the full electricity transmission remedy for substantial-conclude equipment producing industries based on the intention of “System Solution, Software Style and Professional Provider”.
CZPTshine have a powerful technological pressure with in excess of 350 employees at existing, which includes above 30 engineering specialists, thirty quality inspectors, masking an region of 80000 square meters and varieties of CZPTd processing machines and screening equipments. We have a very good foundation for the market application growth and service of higher-stop pace reducers & variators possessing to the provincial engineering engineering study centre,the lab of gear pace reducers, and the foundation of contemporary R&D.

Our Crew

Good quality Handle
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

 

S Series Helical Worm Gear Set