S series CZPTcal Geared Motor Attributes
1. Functions:
- Higher performance: seventy five%-eighty%
- Substantial technology: the helical equipment and a worm gear blended with an integrated transmission to boost the torque and efficiency.
- Large precision: the gear is created of large-top quality alloy metal forging, carbonitriding and hardening treatment method, grinding procedure to make sure higher precision and steady operating.
- Large interchangeability: very modular, serial design and style, powerful versatility and interchangeability.
2. CZPT parameters
Ratio | six.8-288 |
Input electricity | .twelve-22KW |
Output torque | eleven-4530N.m |
Output speed | 5-206rpm |
Mounting type | Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Approach | Flange enter(AM), shaft input(Ad), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-handbook release(lock in the brake launch situation), HR-guide release(autom-atic braking situation) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Place | M1, M2, M3, M4, M5, M6 |
Variety | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing substance | HT200 large-strength solid iron from R37,forty seven,57,67,seventy seven,87 |
Housing content | HT250 Higher toughness forged iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening therapy |
One Stage Performance | seventy five%-80% |
Lubricant | VG220 |
Security Course | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned navy mould enterprise, was set up in 1965. CZPTshine specializes in the total power transmission solution for large-end gear producing industries based on the purpose of “System Item, Application Layout and Skilled Services”.
CZPTshine have a robust technical force with more than 350 employees at current, like in excess of thirty engineering specialists, thirty top quality inspectors, masking an region of 80000 sq. meters and sorts of CZPTd processing machines and tests equipments. We have a good foundation for the market software development and provider of high-conclude velocity reducers & variators proudly owning to the provincial engineering technologies analysis centre,the lab of equipment speed reducers, and the foundation of contemporary R&D.
Our Group
Quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
seven. Certification.
Packing
Shipping and delivery