S collection CZPTcal Geared Motor Characteristics
one. Characteristics:
- Large performance: seventy five%-eighty%
- Higher technologies: the helical gear and a worm equipment mixed with an integrated transmission to boost the torque and effectiveness.
- Substantial precision: the equipment is produced of higher-high quality alloy metal forging, carbonitriding and hardening treatment method, grinding process to guarantee high precision and secure working.
- Substantial interchangeability: extremely modular, serial style, strong versatility and interchangeability.
2. CZPT parameters
Ratio | six.eight-288 |
Input electricity | .12-22KW |
Output torque | eleven-4530N.m |
Output velocity | five-206rpm |
Mounting kind | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Technique | Flange input(AM), shaft enter(Advertisement), inline AC motor input, or AQA servo motor |
Brake Release | HF-manual release(lock in the brake launch situation), HR-handbook release(autom-atic braking placement) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor security Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Sort | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing substance | HT200 high-toughness solid iron from R37,47,fifty seven,67,seventy seven,87 |
Housing material | HT250 Large strength solid iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening therapy |
One Stage Performance | seventy five%-80% |
Lubricant | VG220 |
Safety Course | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould business, was established in 1965. CZPTshine specializes in the comprehensive electricity transmission remedy for large-end equipment production industries dependent on the goal of “System Product, Software Layout and Professional Services”.
CZPTshine have a strong complex power with above 350 employees at existing, including in excess of thirty engineering experts, 30 top quality inspectors, masking an location of 80000 sq. meters and kinds of CZPTd processing machines and screening equipments. We have a good basis for the industry software development and provider of substantial-finish speed reducers & variators proudly owning to the provincial engineering technology research heart,the lab of gear speed reducers, and the base of modern R&D.
Our Group
Good quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping and delivery