F sequence Parallel Shaft-CZPTcal Geared Motor Qualities
one.Attributes:
- Large effectiveness: ninety two%-ninety four%
- Parallel output, compact composition, big output torque, easy procedure, minimal noise and lengthy support daily life.
- Substantial precision: the gear is created of substantial-top quality alloy steel forging, carbonitriding and hardening remedy, grinding procedure to ensure large precision and secure working.
- High interchangeability: very modular, serial layout, powerful flexibility and interchangeability.
2. CZPT parameters
Ratio | 3.77-276.77 |
Enter electrical power | .twelve-200KW |
Output torque | three.five-21700N.m |
Output velocity | five-352rpm |
Mounting sort | Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Method | Flange enter(AM), shaft input(Advert), inline AC motor input, or AQA servo motor |
Brake Launch | HF-manual launch(lock in the brake launch situation), HR-guide release(autom-atic braking place) |
Thermistor | TF(Thermistor protection PTC thermisto) TH(Thermistor defense Bimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Type | F37-F157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing material | HT200 higher-power cast iron from R37,forty seven,57,sixty seven,seventy seven,87 |
Housing materials | HT250 High strength solid iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening remedy |
Efficiency | 92%-94% |
Lubricant | VG220 |
Defense Class | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould business, was proven in 1965. CZPTshine specializes in the total electrical power transmission remedy for large-stop tools production industries based on the goal of “System Item, Software Style and Expert Service”.
CZPTshine have a robust technical drive with in excess of 350 staff at existing, like more than 30 engineering specialists, 30 high quality inspectors, masking an spot of 80000 square meters and sorts of CZPTd processing machines and testing equipments. We have a great basis for the business software advancement and support of large-finish pace reducers & variators owning to the provincial engineering engineering study heart,the lab of equipment speed reducers, and the foundation of present day R&D.
Our Staff
High quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
7. Certification.
All our merchandise get ISO & CE & UL certification.
Packing
Shipping