S sequence CZPTcal Geared Motor Qualities
one. Characteristics:
- High effectiveness: 75%-eighty%
- Higher engineering: the helical equipment and a worm gear blended with an integrated transmission to boost the torque and efficiency.
- Substantial precision: the gear is produced of high-top quality alloy steel forging, carbonitriding and hardening treatment method, grinding approach to ensure high precision and secure running.
- High interchangeability: hugely modular, serial design, strong versatility and interchangeability.
2. CZPT parameters
Ratio | 6.eight-288 |
Enter energy | .12-22KW |
Output torque | eleven-4530N.m |
Output speed | 5-206rpm |
Mounting type | Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Method | Flange enter(AM), shaft input(Advert), inline AC motor enter, or AQA servo motor |
Brake Release | HF-manual launch(lock in the brake launch situation), HR-handbook release(autom-atic braking place) |
Thermistor | TF(Thermistor safety PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Place | M1, M2, M3, M4, M5, M6 |
Variety | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing material | HT200 substantial-strength forged iron from R37,forty seven,57,sixty seven,seventy seven,87 |
Housing substance | HT250 Large toughness cast iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening remedy |
Solitary Stage Efficiency | 75%-eighty% |
Lubricant | VG220 |
Protection Class | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould business, was recognized in 1965. CZPTshine specializes in the full energy transmission resolution for high-end tools manufacturing industries primarily based on the purpose of “Platform Merchandise, Application Style and Expert Provider”.
CZPTshine have a sturdy specialized pressure with above 350 workers at existing, such as above 30 engineering technicians, 30 good quality inspectors, masking an location of 80000 square meters and kinds of CZPTd processing machines and screening equipments. We have a very good basis for the market software development and services of substantial-conclude velocity reducers & variators owning to the provincial engineering technologies investigation heart,the lab of gear velocity reducers, and the foundation of modern R&D.
Our Group
Quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping and delivery