S series CZPTcal Geared Motor Attributes
1. Characteristics:
- High efficiency: seventy five%-80%
- Large engineering: the helical gear and a worm equipment merged with an integrated transmission to enhance the torque and performance.
- Large precision: the gear is created of large-top quality alloy metal forging, carbonitriding and hardening treatment, grinding process to guarantee substantial precision and steady operating.
- Higher interchangeability: hugely modular, serial design, strong flexibility and interchangeability.
two. CZPT parameters
Ratio | 6.8-288 |
Enter power | .12-22KW |
Output torque | eleven-4530N.m |
Output speed | 5-206rpm |
Mounting type | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Approach | Flange enter(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-guide launch(lock in the brake launch situation), HR-handbook release(autom-atic braking situation) |
Thermistor | TF(Thermistor safety PTC thermisto) TH(Thermistor defense Bimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Kind | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing substance | HT200 large-power forged iron from R37,47,fifty seven,67,seventy seven,87 |
Housing content | HT250 Substantial energy solid iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening therapy |
Solitary Phase Effectiveness | 75%-eighty% |
Lubricant | VG220 |
Defense Course | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould enterprise, was recognized in 1965. CZPTshine specializes in the full energy transmission answer for high-end gear production industries based on the aim of “Platform Solution, Application Layout and Professional Support”.
CZPTshine have a robust technical force with in excess of 350 staff at existing, like above 30 engineering experts, thirty top quality inspectors, covering an region of 80000 sq. meters and kinds of CZPTd processing machines and testing equipments. We have a good foundation for the industry application improvement and service of high-conclude velocity reducers & variators owning to the provincial engineering technologies study centre,the lab of gear pace reducers, and the base of modern day R&D.
Our Staff
Top quality Manage
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
seven. Certification.
Packing
Shipping and delivery